UST Testers
Facility Equipment Testing Forms:
Containment Sump Testing
Containment
Sump Test Form
"Sump Testing" must be performed every three (3) years. New installations cannot use low level testing for the first test after new installation. It can be used thereafter if it has a positive shut off device.
Containment
Sump Low Level Test Form
Must be performed every three (3) years.
Guidance
for Low Level Hydrostatic Test
Overfill Prevention
Ball
Float Inspection and Diagram
Spill Prevention (Spill Bucket)
Three-year
Spill Prevention Equipment (Spill Bucket) Integrity Test Report
Release Detection Equipment Testing
Cathodic Protection Testing
Galvanic-Cathodic
Protection Monitoring Form
Impressed
Current-Cathodic Protection Monitoring Form
Walkthrough Inspection
30-day
Walkthrough Inspection Checklist
Annual
Walkthrough Inspection Checklist
Compatibility
Compatibility
Demonstration Log
Stage I EVR Test (only in ozone non-attainment areas):
Stage
I EVR Test Notification Form
- Note that this is a fillable PDF form and you will need to download it to your computer before completing it.