UST Testers

Facility Equipment Testing Forms:

Containment Sump Testing

Containment Sump Test Form  (PDF, 364.74 KB)  "Sump Testing" must be performed every three (3) years. New installations cannot use low level testing for the first test after new installation. It can be used thereafter if it has a positive shut off device.

Containment Sump Low Level Test Form  (PDF, 173.79 KB)  Must be performed every three (3) years.

Guidance for Low Level Hydrostatic Test  (PDF, 503.24 KB)  

 

Overfill Prevention

Alarm and Diagram  (PDF, 808.04 KB)  

Ball Float Inspection and Diagram  (PDF, 1.31 MB)  

Flapper Valve and Diagram  (PDF, 1.4 MB)  

Appendix C Complete Shutoff  (PDF, 562.63 KB)

 

Spill Prevention (Spill Bucket)

Three-year Spill Prevention Equipment (Spill Bucket) Integrity Test Report  (PDF, 251 KB)  

 

Release Detection Equipment Testing

Probe Test  (PDF, 1.1 MB)  

Leak Detector Test  (PDF, 257.52 KB)

Sensor Functionality Test   (PDF, 197.37 KB)

 

Cathodic Protection Testing

Galvanic-Cathodic Protection Monitoring Form  (PDF, 1.07 MB)  

Impressed Current-Cathodic Protection Monitoring Form  (PDF, 943.41 KB)  

 

Walkthrough Inspection

30-day Walkthrough Inspection Checklist  (PDF, 878.45 KB)  

Annual Walkthrough Inspection Checklist  (PDF, 864.53 KB)

 

Compatibility 

Compatibility Demonstration Log  (PDF, 457.16 KB)  

 

Stage I EVR Test (only in ozone non-attainment areas):

Stage I EVR Test Notification Form  (PDF, 732.15 KB)  - Note that this is a fillable PDF form and you will need to download it to your computer before completing it.