BD Covington Tests, Monitoring Reports and Engineering Studies
-
GDC
Stack Test Report Review Summary (fugitive emissions control system) – April 13, 2022 -
EPD
test review (BD Covington dry bed system 1) - July 20, 2021 -
EPD
test review (BD Covington dry bed system 2) – July 20, 2021 -
BD
Covington test report (dry bed systems 1 & 2) – May 28, 2021 -
GDC
Stack Test Report Review Summary (fugitive emissions control system) - March 10, 2021 -
GDC
Stack Test Report (fugitive emissions control system) - February 17, 2021 -
BD
Covington Compliance Monitoring Report - August 18, 2020 -
Updated:
EPD review of retest (BD Covington dry bed system 1) – June 19, 2020 -
BD
Covington test report (dry bed system 1) – June 19,2020 -
EPD
test review letter (BD Covington dry bed system 1) – June 15, 2020 -
EPD
test review (BD Covington dry bed system 1) - June 15, 2020 -
EPD
test review (BD Covington dry bed system 2) – April 2, 2020 -
EPD's
Test Plan Approval Letter dated 3/31/20 -
BD
Covington Test Plan dated 3/27/20
-
Packaging
and Wood Pallet Engineering Studies -
BD's
Monitoring Results -
BD's
Monitoring Locations Near The GDC -
GDC
Warehouse Engineering Study #1 -
GDC
Weekly Warehouse Sampling Plan -
GDC
Neighborhood Sampling Plan -
GDC
Sampling Results Dec.20-21, 2019 -
GDC
Sampling Results Dec.26-27, 2019 -
BD
Wheat Street Warehouse Sampling Report -
Foley
Catheter Procedural Trays Certification -
EPD
Ethylene Oxide Monitoring Plan - Approved by US EPA - September 2019
-
BD
Covington Modeling Memorandum - June 7, 2019 -
BD
Covington Test Report/Sterilization Vessel - July 8, 2012 -
BD
Covington Test Report/Aeration Cells - July 18, 2012 -
EPD
Compliance Monitoring Report for BD Covington - May 21, 2015