BD Covington Tests, Monitoring Reports and Engineering Studies
- 
	
GDC Stack Test Report Review Summary (fugitive emissions control system) – April 13, 2022
 - 
	
EPD test review (BD Covington dry bed system 1) - July 20, 2021
 - 
  
EPD test review (BD Covington dry bed system 2) – July 20, 2021
 - 
  
BD Covington test report (dry bed systems 1 & 2) – May 28, 2021
 - 
  
GDC Stack Test Report Review Summary (fugitive emissions control system) - March 10, 2021
 - 
  
GDC Stack Test Report (fugitive emissions control system) - February 17, 2021
 - 
  
BD Covington Compliance Monitoring Report - August 18, 2020
 - 
  
Updated: EPD review of retest (BD Covington dry bed system 1) – June 19, 2020
 - 
  
BD Covington test report (dry bed system 1) – June 19,2020
 - 
  
EPD test review letter (BD Covington dry bed system 1) – June 15, 2020
 - 
  
EPD test review (BD Covington dry bed system 1) - June 15, 2020
 - 
  
EPD test review (BD Covington dry bed system 2) – April 2, 2020
 - 
  
EPD's Test Plan Approval Letter dated 3/31/20
 - 
  
BD Covington Test Plan dated 3/27/20
 
- 
  
Packaging and Wood Pallet Engineering Studies
 - 
  
BD's Monitoring Results
 - 
  
BD's Monitoring Locations Near The GDC
 - 
  
GDC Warehouse Engineering Study #1
 - 
  
GDC Weekly Warehouse Sampling Plan
 - 
  
GDC Neighborhood Sampling Plan
 - 
  
GDC Sampling Results Dec.20-21, 2019
 - 
  
GDC Sampling Results Dec.26-27, 2019
 - 
  
BD Wheat Street Warehouse Sampling Report
 - 
  
Foley Catheter Procedural Trays Certification
 - 
  
EPD Ethylene Oxide Monitoring Plan - Approved by US EPA - September 2019
 
- 
  
BD Covington Modeling Memorandum - June 7, 2019
 - 
  
BD Covington Test Report/Sterilization Vessel - July 8, 2012
 - 
  
BD Covington Test Report/Aeration Cells - July 18, 2012
 - 
  
EPD Compliance Monitoring Report for BD Covington - May 21, 2015