Apply for SIP

SIP Application Forms

  • Download this doc file. Form 1.00 General Information
    Must be completed and submitted with ALL Georgia SIP Air Permit Applications, along with any other relevant forms listed below.

Emission Unit Forms

  • Form 2.00 Emission Unit List
    Must be included if requesting the construction, operation, and/or modification of any emission unit.
  • Form 2.01 Boilers and Other Fuel Burning Equipment
    Must be included if requesting the construction, operation, and/or modification of any fuel burning equipment (boiler, burner, engine, turbine, dryer, smelter, etc.) excluding incinerators.
  • Form 2.02 Organic Compound Storage Tanks
    Must be included if requesting the construction, operation, and/or modification of any organic compound storage tank greater than 4000 gallons.
  • Form 2.03 Printing Operations
    Must be included if requesting the construction, operation, and/or modification of a printing press.
  • Form 2.04 Surface Coating operations
    Must be included if requesting the construction, operation, and/or modification of any surface coating process, excluding Printing Operations.
  • Form 2.05 Waste Incinerators
    Must be included if requesting the construction, operation, and/or modification of a solid/liquid waste destruction operation. For additional reference material on determining the type of waste combusted in the incinerator, please refer to the Waste Classification Guide.
  • Form 2.06 Manufacturing and Operating Information
    Must be included if requesting the construction, operation, and/or modification of the manufacturing process.

Air Pollution Control Device Forms

Other Forms

  • Form 4.00 Emissions Information
    This form is to be completed and submitted with any Georgia SIP Air Permit application for the construction, operation, and/or modification of process equipment, fuel burning equipment, and/or air pollution control equipment.
  • Form 5.00 Monitoring Information
    Must be included if requesting the construction, operation, and/or modification of an emission unit(s)/source(s) that discharges air pollutants into the atmosphere through a stack(s) and has monitoring equipment installed or monitoring required (Visible emission checks).
  • Download this doc file. Form 6.00 Fugitive Emission Sources
    Must be included if the facility has any fugitive emission sources
  • Download this doc file. Form 7.00 Air Modeling Information
    Must be included if the request involves the construction, operation, and/or modification of an emission unit(s)/source(s) that discharges air pollutants into the atmosphere generally through a stack(s) and requires computer air modeling.

Additional SIP Permitting Information

  • Download this doc file. Name Change Form
    Submit only this form if the facility is changing its name.
  • Download this doc file. Change in Ownership Form
    Submit only this form if the facility is changing owners. If a facility name change is also occurring with the change in ownership, do not submit the Name Change Form. The Change in Ownership Form handles both. If the facility is a Title V source, then an updated Title V application will need to be submitted IN ADDITION to the appropriate SIP Name/Ownership Change form. Note: Only the first three sections (through the Applicable Rules section) of the Title V application should be completed through GEOS.
  • SIP Exemption Attachment
    Include this attachment with the SIP Application, if the facility has performed any past exempt permitting activities according to Georgia Air Quality Rule 391-3-1-.03(6)(i)3.
  • Download Entire Package (self-executable Zip™ file)
    After saving the file to your computer's hard drive, double-click the file and choose a location for extracting the application files.

Title V Permit

Synthetic Minor Permit

Permit-by-Rule