Solid Waste Technical Guidance
Landfills
-
Monitoring
of Surface Water and Underdrain Systems at Solid Waste Facilities Guidance [Revised September 2021] -
High
Moisture Content Waste Managment Plans [Revised July 2021] -
Hazardous
Waste Trust Fund Local Government Reimbursement FAQs [Revised November 2021] -
Five-Year
Permit Review Guidance [Revised Oct 2018] -
Groundwater
Release from Site Notification Requirements [Revised Oct 2018] -
Coal
Combustion Residuals (CCR) Management Plan Guidance [Revised Dec 2016] -
Methane
Monitoring at Solid Waste Disposal Facilities [Revised Sep 2015] -
Final
Cover Installation for an Unlined Landfill [Revised Jan 2014] -
Reporting
Requirements for Landfills [Revised Jan 2014] (also see OCGA 12-8-31) -
Certification
Requirements for Landfill Operators [Revised Apr 2008] -
Criteria
for Performing Site Acceptability Studies for Solid Waste Landfills in Georgia (Circular 14) [Revised 1997]
Inert Waste Landfills
-
Inert
Landfill Checklist for Complete Solid Waste Handling Permit Application [Revised Aug 2015] -
Inert
Landfill Site Suitability Criteria Guidance and Checklist [Revised May 2014]
Financial Assurance
Miscellaneous
-
Transfer
Station and Collection Operation Guidance [Revised Oct 2018] - Dead Animal Disposal [Revised Jan 2020]
- Management of Yard Trimmings [Revised Feb 1996] (also see OCGA 12-8-40.2)
-
Empty
Pesticide Container Handling [Revised Jun 1995]
Offsite Links
- Association of State and Territorial Solid Waste Management Officials
- Federal Register Environmental Documents
- Georgia Department of Community Affairs
- Georgia Environmental Finance Authority
- U.S. EPA Office of Groundwater and Drinking Water
- U.S. EPA Waste Regulatory Information
- U.S. EPA Office of Land and Emergency Management